PC 107
Certificate Details
- Certificate Number: PC 107
- Document ID: LAKS010915
- Expiration: Friday, 31 August 2029
Main Certification Holder Details
- Company Name: LAKSHMI METAL TECH LLC
- Company Address: P.O. Box 119867, Al Quoz Industrial Area 2, Dubai, United Arab Emirates
- Participating Site(s): NONE
- Nominated Agent(s): NONE
Certification Details
- Scheme: Q-Plus Product Conformity Scheme for Fire Door
- Certificate Status: Active
- Certification Type: Single Site Certification
- Certificate maintenance: Validity of the Certificate is subject to Yearly / 6 month Surveillance Audit
- Surveillance Audit Status: No Pending
Scope of Certification
| Test Report Ref. | Product Description | Tested Properties | Test Standard | ||
| Integrity | Insulation | Radiation | |||
| TBWIC_JK 04 (Rev. 01) | LMT_Latched, Single Acting, Double Leaf Steel Doorset with Mineral Core_240 Minutes Integrity | 240 minutes (up to 254 minutes) | 10 minutes | - | BS 476-22:1987 |
| TBWIC_OE071 (Rev. 01) | LMT_Latched, Single Acting, Single Leaf Steel Doorset_FD 90 minutes | 90 minutes | - | Hose Stream = No Failure | UL 10C: Edition 2 |
| Chilt_RF09091 | LMT_Latched, Single Acting, Single Leaf Steel Doorset using Honeycomb Core with or without Vision Panel_FD 90 minutes | 90 minutes (up to 116 minutes) | - | - | BS 476-22:1987 |
| Chilt/RF09093 | LMT – Latched, Single Acting, Single Leaf Steel Doorset using Rockwool Core with or without Vision Panel – FD 60 minutes | 60 minutes | - | - | BS 476-22:1987 |
| TBWIC_WC148-1A | LMT_Latched, Singled-Acting, Double Leaf Steel Doorset with Honeycomb Infill and Overhead Transom Panel with or without Vision Panel | 120 minutes | - | Hose Stream = No Failure | UL 10C:2016 |
| Assessment Report Ref. | Product Description | Tested Properties | Test Standard | ||
| Integrity | Insulation | Loadbearing Capacity | |||
| Chilt_A10032 | LMT_Latched, Single Acting Single or Double Leaf Steel Doorset with Mineral Wool Core_240 Minutes Integrity | Up to 240 minutes | - | - | BS 476-22:1987 |
| Certifire_CF 291 | LMT – Steel Framed Fully Glazed Screens | 30, 60, 90 and 120 minutes | - | - | BS 476-22:1987 |
| Certifire_CF 291 | LMT – Steel Framed Fully Double Glazed Screens | 30, 60, and 90 minutes | - | - | BS 476-22:1987 |
| Certifire_CF 291 | LMT – Steel Framed Fully Double Glazed Screens comprising Venetian Blinds | 30 minutes | - | - | BS 476-22:1987 |
| Certifire_CF 291 | LMT – Steel Framed Butt-Joined Assemblies Fully Glazed Screens | 30 & 60 minutes | - | - | BS 476-22:1987 |
| Certifire_CF 291 | LMT – Steel Framed Structural Glazing System | 30 minutes | - | - | BS 476-22:1987 |
| Certifire_CF 291 | LMT – Steel Framed Horizontal Single or Double Glazing System | 30 minutes | - | - | BS 476-22:1987 |
| Certifire_CF 291 | LMT – Steel Framed Smoke Screens | 60 minutes | - | - | BS 476-22:1987 |
