PC 336
Certificate Details
- Certificate Number: PC 336
- Document ID: MONO100925
- Expiration: Monday, 09 September 2030
Main Certification Holder Details
- Company Name: MONOLITH FIRE RESISTANT WOOD INDUSTRY
- Company Address: 11 Breej 5 St., Mussafah M-42, Abu Dhabi, United Arab Emirates
Certification Details
- Scheme: Q-Plus Product Conformity Scheme for Fire Door
- Certificate Status: Active
- Certification Type: Single Site Certification
- Certificate maintenance: Validity of the Certificate is subject to Yearly / 6 month Surveillance Audit
- Surveillance Audit Status: No Pending
Scope of Certification
| Test Report Ref. | Product Description | Tested Results/Properties | Test Standard | ||
| Integrity | Insulation | Others | |||
| ML_FRR-2412/2236 (2412101177) | Monolith_Latched, Single Acting, Single Leaf Wooden Doorset with or without Vision Panel_54mm thick USI 60 ProShield Core_Non-Loadbearing Assembly_SP1 | 90 minutes (up to 91 minutes) | 60 minutes (up to 61 minutes) | Radiation = 5 kW/m2 (at 55 minutes) | BS EN 1634-1: 2014+A1:2018 |
| ML_FRR-2412/2236 (2412101177) | Monolith_Latched, Single Acting, Single Leaf Wooden Doorset with or without Vision Panel_64mm thick USI 90 ProShield Core_Non-Loadbearing Assembly_SP2 | 90 minutes (up to 91 minutes) | 90 minutes (up to 91 minutes) | Radiation = 10 kW/m2 (at 86 minutes) | BS EN 1634-1: 2014+A1:2018 |
| ML_FRR-2501/2773 (2501101180) | Monolith_Latched, Single Acting, Double Leaf Wooden Doorset with or without Vision Panel_54mm thick USI 60 ProShield Core_Non-Loadbearing Assembly | 60 minutes (up to 61 minutes) | 60 minutes (up to 61 minutes) | Radiation = 10 kW/m2 (at 59 minutes) | BS EN 1634-1: 2014+A1:2018 |
| ML_FRR-2507/15001 (2507281194) | Monolith_Latched, Single Acting, Double Leaf Wooden Doorset with or without Vision Panel_50mm thick Xyloban Core_Non-Loadbearing Assembly | 90 minutes (up to 92 minutes) | 90 minutes (up to 92 minutes) | - | BS 476 Part 22:1987 (Amd. 2014) |
· Test reports shall not be combined with primary FoA reports. It is crucial to follow the test reports precisely to ensure accurate results and reliable product performance.
