Print this page

PC 327

  • Certificate Details

  • Certificate Number: PC 327
  • Document ID: BANF311224
  • Expiration: Sunday, 30 December 2029
  • Main Certification Holder Details

  • Company Name: BAN FOUR DWC LLC
  • Company Address: P.O. Box 263127, Building A3, Business Center, Dubai World Trade Center, Dubai, United Arab Emirates
  • Participating Site(s): DANSN NEW MATERIALS - Guangdong Province, China
  • Nominated Agent(s): NONE
  • Certification Details

  • Scheme: Q-Plus Product Conformity Scheme for Fire Door
  • Certificate Status: Active
  • Certification Type: Single Site Certification
  • Certificate maintenance: Validity of the Certificate is subject to Yearly / 6 month Surveillance Audit
  • Surveillance Audit Status: No Pending

Scope of Certification


Test Report Ref.
Product Description Tested Results/ Properties Test Standard
Integrity Insulation/ Other
ITS_190527003SHF-001 FD 60_45mm thick DANSNBAN Composite Core 01, BanFour DWC LLC 60 minutes 60 minutes BS 476 Part 22:1987
ITS_190527003SHF-003 FD 60_45mm thick DANSNBAN Composite Core 01, BanFour DWC LLC 60 minutes 60 minutes NFPA 252-2017 UL 10C-2016 UL 10B-2015
ML_FRR-2003/5080 B C2-2 (200318762) FD 60_58mm thick DANSNBAN Composite Core 02, BanFour DWC LLC 60 minutes Hose Stream = No Failure UL 10C-2016
ITS_190527003SHF-004 FD 90_45mm thick DANSNBAN Composite Core 03, BanFour DWC LLC 90 minutes Hose Stream = No Failure NFPA 252-2017 UL 10C-2016 UL 10B-2015
ITS_190527003SHF-002 FD 20_45mm thick DANSNBAN Composite Core 04, BanFour DWC LLC 20 minutes Hose Stream = No Failure NFPA 252-2017 UL 10C-2016 UL 10B-2015
ML_FRR-2011/5434 C2-2 (201126828) FD 90_50mm thick DANSNBAN Composite Core 05, BanFour DWC LLC 90 minutes Hose Stream = No Failure UL 10C-2016
ML_FRR-2011/5435 C2-2 (201119827) FD 90_50mm thick DANSNBAN Composite Core 05, BanFour DWC LLC 90 minutes Hose Stream = No Failure UL 10C-2016
·         No alterations shall be made to any product specifications or parameters mentioned in the test report such as design, components, performance criteria without prior approval from CCS. Any violation of this requirement will invalidate existing test reports and certification approvals.
·         Test reports shall not be combined with primary FoA reports. It is crucial to follow the test reports precisely to ensure accurate results and reliable product performance.