PC 310
Certificate Details
- Certificate Number: PC 310
- Document ID: ASSA030124-W
- Expiration: Tuesday, 02 January 2029
Main Certification Holder Details
- Company Name: ASSA ABLOY MIDDLE EAST INDUSTRIES L.L.C.
- Company Address: Plot No. TP070401, National Industries Park, Dubai, United Arab Emirates
Certification Details
- Scheme: Q-Plus Product Conformity Scheme for Fire Door
- Certificate Status: Active
- Certification Type: Single Site Certification
- Certificate maintenance: Validity of the Certificate is subject to Yearly Surveillance Audit
- Surveillance Audit Status: No Pending
Scope of Certification
| Test Report Ref. | Product Description | Test Result | Test Standard |
| Integrity | |||
|
TBWIC_XF091-1B (Rev. 02) |
Assa Abloy_Latched, Single-Acting Single Leaf Wooden Doorset with Steel Frame_52mm thick Fireblock Dura-L40/SR70 Door Blank_Non-Loadbearing Assembly | 20 / 45 / 60 minutes | UL 10C |
| TBWIC_WI045-1A (INTERTEK_01279082SHJ-002) | Assa Abloy_Latched, Single-Acting Double Leaf Wooden Doorset with Wooden Frame with or without Vision Panel _52mm thick Fireblock Dura L40 Core_Non-Loadbearing Assembly | 20 / 45 / 60 / 90 minutes (without vision panel) 20 / 45 minutes (with vision panel) | UL 10C |
| TBWIC_XF091-3B | Assa Abloy_Latched, Single-Acting Single Leaf Wooden Doorset with Steel Frame_52mm thick Fireblock Dura-L40/SR70 Door Blank_Non-Loadbearing Assembly | 60 minutes | BS 476 Part 22 |
| TBWIC_XF091-4B | Assa Abloy_Latched, Single-Acting Single Leaf Wooden Doorset with Wooden Frame _ 52mm thick Fireblock DURA-F40 Frame & 52mm thick Fireblock DURA L40-FMB Door Blank_Non-Loadbearing Assembly | 60 minutes | BS 476 Part 22 |
| ML_FRR- 2403/481 C2-2 (2401151128) | Assa Abloy_Latched, Single-Acting Double Leaf Wooden Doorset with or without Vision Panel_52mm thick Fireblock ALTUS -FMB Door Blank Non-Loadbearing Assembly | 90 minutes (Up to 92 minutes) | BS 476 Part 22 |
| ML_FRR- 2403/480 C2-2 (2401241131) | Assa Abloy_Latched, Single-Acting Double Leaf Wooden Doorset with or without Vision Panel_54mm thick ALTUS FD-60 Core_Non-Loadbearing Assembly | 60 minutes (Up to 62 minutes) | BS EN 1634-1 |
| ML_FRR-2306/1427 C2-2 (2401201130) | Assa Abloy_Latched, Single-Acting Double Leaf Wooden Doorset with or without Vision Panel_ 64mm thick Fireblock Altus FD-90 Core_Non-Loadbearing Assembly | 90 minutes (Up to 95 minutes) | BS EN 1634-1 |
| TBWIC_SI012 | Assa Abloy_Latched, Single Acting, Double Leaf Doorset without Vision Panel_Halspan Optima FD30_Non-Load Bearing Assembly | 30 minutes (Up to 30 minutes) | BS 476 Part 22 |
| TBWIC_QI024-B (Rev. 01) | Assa Abloy_Latched, Single Acting, Single Leaf Doorset without Vision Panel_Composite Door Blank 01_Non-Load Bearing Assembly | 60 minutes (Up to 84 minutes) | BS 476 Part 22 |
| TBWIC_OC062 (Rev. 01) | Assa Abloy_Latched, Single Acting, Single Leaf Doorset without Vision Panel_Halspan Prima 64mm_Non-Load Bearing Assembly_Doorset A | 60 minutes (Up to 81 minutes) | BS 476 Part 22 |
| TBWIC_OC062 (Rev. 01) | Assa Abloy_Latched, Single Acting, Single Leaf Doorset without Vision Panel_Halspan Optima 54mm_Non-Load Bearing Assembly_Doorset B | 60 minutes (Up to 63 minutes) | BS 476 Part 22 |
| TBWIC_OF001 (Rev. 01) | Assa Abloy_Latched, Single Acting, Single Leaf Doorset without Vision Panel_Composite Door Blank 02_Non-Load Bearing Assembly_Doorset A | 60 minutes (Up to 84 minutes) | BS 476 Part 22 |
| TBWIC_OF001 (Rev. 01) | Assa Abloy_Latched, Single Acting, Single Leaf Doorset without Vision Panel_Halspan Optima 64mm_Non-Load Bearing Assembly_Doorset B | 60 minutes (Up to 82 minutes) | BS 476 Part 22 |
| TBWIC_OF051 (Rev. 02) | Assa Abloy_Latched, Single Acting, Double Leaf Doorset without Vision Panel_Composite Door Blank 03_Non-Load Bearing Assembly_Doorset B | 60 minutes (Up to 80 minutes) | BS 476 Part 22 |
| TBWIC_OF051 (Rev. 02) | Assa Abloy_Latched, Single Acting, Single Leaf Doorset without Vision Panel_Composite Door Blank 03_Non-Load Bearing Assembly_Doorset A | 90 minutes (Up to 110 minutes) | BS 476 Part 22 |
| TBWIC_RG012 (Rev. 01) | Assa Abloy_Latched, Single Acting, Double Leaf Doorset without Vision Panel in Steel Frame_Composite Door Blank 01_Non-Load Bearing Assembly | 90 minutes (Up to 90 minutes) | BS 476 Part 22 |
| TBWIC_SH016-3 | Assa Abloy_Latched, Single Acting, Single Leaf Doorset with Vision Panel in Steel Frame_Composite Door Blank 04_Non-Load Bearing Assembly | 90 minutes (Up to 90 minutes) | BS 476 Part 22 |
| TBWIC_SL046 | Assa Abloy_Latched, Single Acting, Double Leaf Doorset with Vision Panel in Steel Frame_Composite Door Blank 04_Non-Load Bearing Assembly_Doorset A | 90 minutes (Up to 90 minutes) | BS 476 Part 22 |
| TBWIC_QF047 (Rev. 01) | Assa Abloy_Latched, Single Acting, Single Leaf Doorset with Vision Panel_Composite Door Blank 05_Non-Load Bearing Assembly_Doorset A | 90 minutes (Up to 95 minutes) | BS 476 Part 22 |
| TBWIC_QF047 (Rev. 01) | Assa Abloy_Latched, Single Acting, Single Leaf Doorset without Vision Panel_Composite Door Blank 06_Non-Load Bearing Assembly_Doorset B | 30 minutes (Up to 47 minutes) | BS 476 Part 22 |
| TBWIC_WI045-1A | Assa Abloy_Latched, Single Acting, Single Leaf Doorset with Vision Panel and Overhead Panel in Composite Frame_Composite Door Blank 07_Non-Load Bearing Assembly_Doorset B | 45 minutes | UL 10C |
| TBWIC_SL049-3 | Assa Abloy_Latched, Single Acting, Double Leaf Doorset with Vision Panel_Composite Door Blank 08_Non-Load Bearing Assembly | 45 minutes | UL 10C |
| TBWIC_TC034 (Rev. 01) | Assa Abloy_Latched, Single Acting, Double Leaf Doorset with Vision Panel in Steel Frame_Composite Door Blank 09_Non-Load Bearing Assembly | 45 minutes | UL 10C |
| TBWIC_WI045-1A | Assa Abloy_Latched, Single Acting, Double Leaf Doorset with Vision Panel and Over Panel in Composite Frame_Composite Door Blank 10_Non-Load Bearing Assembly | 45 minutes | UL 10C |
| TBWIC_SH016-1 | Assa Abloy_Latched, Single Acting, Single Leaf Doorset with Vision Panel_Composite Door Blank 11_Non-Load Bearing Assembly | 90 minutes | UL 10C |
| TBWIC_WC120-1 | Assa Abloy_Latched, Single Acting, Single Leaf Doorset with Vision Panel in Steel Frame_Composite Door Blank 12_Non-Load Bearing Assembly | 90 minutes | UL 10C |
| TBWIC_RJ107-B (Rev. 02) | Assa Abloy_Latched, Single Acting, Single Leaf Doorset without Vision Panel in Steel Frame_Composite Door Blank 11_Non-Load Bearing Assembly | 90 minutes | UL 10C |
| TBWIC_SL049-2 | Assa Abloy_Latched, Single Acting, Single Leaf Doorset with Vision Panel in Steel Frame_Composite Door Blank 12_Non-Load Bearing Assembly | 90 minutes | UL 10C |
| TBWIC_RJ024 (Rev. 02) | Assa Abloy_Latched, Single Acting, Double Leaf Doorset without Vision Panel in Steel Frame_Composite Door Blank 11_Non-Load Bearing Assembly | 90 minutes | UL 10C |
| TBWIC_TA108 (Rev. 01) | Assa Abloy_Latched, Single Acting, Double Leaf Doorset with Vision Panel in Steel Frame_Composite Door Blank 11_Non-Load Bearing Assembly | 90 minutes | UL 10C |
prior approval from CCS. Any violation of this requirement will invalidate existing test reports and certification approvals.
· Test reports shall not be combined with primary FoA reports. It is crucial to follow the test reports precisely to ensure accurate results and reliable product performance.