Print this page

PC 271

  • Certificate Details

  • Certificate Number: PC 271
  • Document ID: FAJE110422
  • Expiration: Wednesday, 10 April 2030
  • Main Certification Holder Details

  • Company Name: FAJER ALMDAEN WOODEN DOORS & WINDOWS MANUFACTURING L.L.C.
  • Company Address: Al Qusais Industrial Area 3, Dubai, United Arab Emirates
  • Participating Site(s): NONE
  • Nominated Agent(s): NONE
  • Certification Details

  • Scheme: Q-Plus Product Conformity Scheme for Fire Door
  • Certificate Status: Active
  • Certification Type: Single Site Certification
  • Certificate maintenance: 6-monthly Surveillance and Yearly Surveillance Certification Maintenance

    Q-Plus Labels : To verify the genuinely of the label contact CCS call or email.
  • Surveillance Audit Status: No Pending

Scope of Certification

Test Report Ref. Product Description Tested Results/Properties Test Standard
Integrity Insulation
ML_FRR-2202/3206 (220216983) Fajer Almdaen_Latched, Single Acting, Double Leaf Wooden Doorset with Vision Panel_54mm thick FireBan Core 60_Non-Loadbearing Assembly 60 minutes 60 minutes BS EN 1634-1:2014+A1:2018
ML_FRR-2202/3209 (220203978) Fajer Almdaen_Latched, Single Acting, Single Leaf Wooden Doorset without Vision Panel_54mm thick Fire Ban Core 60_Non-Loadbearing Assembly_SP1 60 minutes 60 minutes BS EN 1634-1:2014+A1:2018
ML_FRR-2202/3209 (220203978) Fajer Almdaen_Latched, Single Acting, Single Leaf Wooden Doorset with or without Vision Panel_64mm thick FireBan Core 90_Non-Loadbearing Assembly_SP2 90 minutes 90 minutes BS EN 1634-1:2014+A1:2018
ML_FRR-2210/166 (2209231019) Fajer Almdaen_Latched, Single Acting, Double Leaf Wooden Doorset with or without Vision Panel_64mm thick FireBan Core 90_Non-Loadbearing Assembly 90 minutes 90 minutes BS EN 1634-1:2014+A1:2018
·          No alterations shall be made to any product specifications or parameters mentioned in the test report such as design, components, performance criteria without prior approval from CCS. Any violation of this requirement will invalidate existing test reports and certification approvals.
·          Test reports shall not be combined with primary FoA reports. It is crucial to follow the test reports precisely to ensure accurate results and reliable product performance.