Print this page

PC 245

  • Certificate Details

  • Certificate Number: PC 245
  • Document ID: LAIN020221
  • Expiration: Thursday, 01 February 2024
  • Main Certification Holder Details

  • Company Name: LAING O’ROURKE JOINERY LLC
  • Company Address: P.O. Box 121895, Jebel Ali Area 2, Dubai, United Arab Emirates
  • Participating Site(s): NONE
  • Nominated Agent(s): NONE
  • Certification Details

  • Scheme: Q-Plus Product Conformity Scheme for Fire Door
  • Certificate Status: Expired
  • Certification Type: Single Site Certification
  • Certificate maintenance: Validity of the Certificate is subject to Yearly / 6 month Surveillance Audit
  • Surveillance Audit Status: No Pending

Scope of Certification

Assessment/ Test Report

Product Description

Tested Properties

Test Standard

Integrity

Others

ML/FRR-2012/2826  C1-2 (201128829)

Laing O’Rourke Joinery _Latched, Single Acting, Single Cladded Leaf Wooden Doorset without Vision Panel_45mm Thick DANSNBAN Composite Core 03

60 Minutes

Hose Stream = No Failure

UL 10C (2016)

ML/FRR-2102/3446  C1-2 (210206852)

Laing O’Rourke Joinery _Latched, Single Acting, Single Leaf Wooden Doorset without Vision Panel_45mm Thick DANSNBAN Composite Core 03

60 Minutes

Hose Stream = No Failure

UL 10C (2016)

ML/FRR-2102/3758  C1-2 (210207853)

Laing O’Rourke Joinery _Latched, Single Acting, Single Leaf Wooden Doorset without Vision Panel_50mm Thick DANSNBAN Composite Core 05

90 minutes

Hose Stream = No Failure

UL 10C (2016)

ML_FRR-2203/994 C1-2 (2206301010_2210061023)

Laing O’Rourke Joinery_Latched, Single Acting, Double Leaf Wooden Doorset without Vision Panel_45mm Thick DANSNBAN Composite Core 03

60 minutes

Hose Stream = No Failure

UL 10C (2016)

ML_FRR-2206/6586

C1-2 (2206231005)


Laing O’Rourke Joinery_Latched, Single Acting, Single Leaf Wooden Doorset without Vision Panel_45mm Thick DANSNBAN Composite Core 03

60 minutes

Hose Stream = No Failure

UL 10C (2016)

ML_FRR-2002/669 SN1/2 A C1-2 (200202750)

Laing O’Rourke Joinery_Latched, Single Acting, Single Leaf Wooden Doorset with Vision Panel_64mm thick Fire Ban Core 90 Minutes

Integrity

Insulation

BS EN

1634-1:2014 +A1:2018


90 minutes

90 minutes

ML_TPWR-1712/10369 C1-2 SN 1/1 (171218557)

Laing O’Rourke Joinery_Unlatched, Single Acting, Double Leaf Wooden Doorset with Vision Panel_54mm thick Fire Ban Core 60 Minutes

60 minutes

60 minutes

BS 476: Part 22: 1987: Amd 2014

ML_TPWR-170701/101 C1-2 SN 1/1 (170518496)

Laing O’Rourke Joinery_Latched, Single Acting, Double Leaf Wooden Doorset with Vision Panel_64mm thick Fire Ban Core 90 Minutes

90 minutes

90 minutes

BS 476: Part 22: 1987: Amd 2014

ML_FRR-2009/7671 C1-2 (200926817)

Laing O’Rourke Joinery_Latched, Single Acting, Double Leaf Wooden Doorset with Vision Panel_64mm thick Fire Ban Core 90 Minutes

90 minutes

90 minutes

BS 476: Part 22: 1987: Amd 2014

ML_FRR-1908/1568 SN 1/1 A (190727685)

Laing O’Rourke Joinery_Unlatched, Double Acting, Double Leaf Wooden Doorset with Vision Panel_64mm thick FireBan Core

60 minutes

60 minutes

BS EN 1634-1: 2014+A1: 2018

ML_FRR-1912/7725

 A C1-2 (191222725) _SP1


Laing O’Rourke Joinery_Latched, Single Acting, Single Leaf Wooden Doorset without Vision Panel_54mm Thick FireBan Core_SP1

60 minutes

60 minutes

BS EN 1634-1: 2014+A1: 2018

ML_FRR-1909/3315

A C1-2 (190909700) _SP2


Laing O’Rourke Joinery_Latched, Single Acting, Single Leaf Wooden Doorset with or without Vision Panel_64mm thick FireBan Core_SP2

90 minutes

90 minutes

BS EN 1634-1: 2014+A1: 2018

ML_TPWR-170410/043

 C1-2 SN 1/1 (170412479)


Laing O’Rourke Joinery_Latched, Single Acting, Single Leaf Wooden Doorset without Vision Panel_54mm thick FireBan Core_SP1

60 minutes

60 minutes

BS 476: Part 22: 1987: Amd 2014

ML_TPWR-170410/043

C1-2 SN 1/1 (170412479)


Laing O’Rourke Joinery_Latched, Single Acting, Single Leaf Wooden Doorset without Vision Panel_54mm thick FireBan Core_SP2

60 Minutes

60 Minutes

BS 476: Part 22: 1987: Amd 2014

ML_TPWR-170410/042

C1-2 SN 1/1 (170411474)


Laing O’Rourke Joinery_Latched, Single Acting, Single Leaf Wooden Doorset with or without Vision Panel_64mm thick FireBan Core_SP1

90 Minutes

90 Minutes

BS 476: Part 22: 1987: Amd 2014

ML_TPWR-170410/042 C1-2 SN 1/1 (170411474)

Laing O’Rourke Joinery_Latched, Single Acting, Single Leaf Wooden Doorset with or without Vision Panel_64mm thick FireBan Composite Core_SP2

120 Minutes

120 Minutes

BS 476: Part 22: 1987: Amd 2014

ML_FRR-2110/6742

C1-2 (211018921)


Laing O’Rourke Joinery_Latched, Single Acting, Double Leaf Wooden Doorset without Vision Panel_54mm thick FireBan Core

60 Minutes

60 Minutes

BS 476: Part 22: 1987: Amd 2014

ML_TPWR-1801/4785

 C1-2 SN 1/1 (180114562)


Laing O’Rourke Joinery_Latched, Single Acting, Double Leaf Wooden Doorset without Vision Panel_64mm thick FireBan Core

60 Minutes

60 Minutes

BS 476: Part 22: 1987: Amd 2014

FAR_PAR/10346/01

Rev. E


Laing O’Rourke Joinery_Timber Framed Timber Leaf Doorset _44mm FireBan 30, 46 mm & 47mm thick FireBan Composite 30

30

minutes


-

BS 476: Part 22: 1987

FAR_PAR/10346/02 Rev. G

Laing O’Rourke Joinery_Timber/Steel Framed Timber Leaf Doorset_54mm thick FireBan 60

60

minutes


-

BS 476: Part 22: 1987

FAR_PAR/11018/01 Rev. E

Laing O’Rourke Joinery_Timber/Steel Framed Timber Leaf Doorset_64mm thick FireBan 90 and 54mm thick FireBan Plus 90

90

minutes


-

BS 476: Part 22: 1987

FAR_PAR/13335/01 Rev. C

Laing O’Rourke Joinery_Timber/Steel Framed Timber Leaf Doorset_64mm thick FireBan Composite Core and 64mm thick FireBan Plus Core

120 minutes

-

BS 476: Part 22: 1987

Chilt/A01204, Rev. G Part 1

Halspan Optima FD 30

30 minutes

-

BS 476: Part 22: 1987

FEA/A01205,

 Rev. I


Halspan Optima FD 60

60 minutes

-

BS 476: Part 22: 1987

FEA/F97174,

Rev. J Part 1


Halspan Prima FD 30

30 minutes

-

BS 476: Part 22: 1987

FEA/F96103,

Rev. O


Halspan Prima FD 60

60 minutes

-

BS 476: Part 22: 1987

Chilt/A05151, Rev. K

Halspan FD 90

90 minutes

-

BS 476: Part 22: 1987

Chilt/A02066, Rev. O

Strebord FD 44 and Strebord FD 54

30 minutes

-

BS 476: Part 22: 1987

Chilt/A09104, Rev. C

Strebord FD 44, Strebord Superpan and Strebord FD 54

30 minutes

-

BS 476: Part 22: 1987

Chilt/A10152, Rev. D

Strebord FD 44, Strebord Superpan and Strebord FD 54

30 minutes

-

BS 476: Part 22: 1987